Stage 11. All missions. Click to learn more

  • Writing the code of the whole program for all the tasks.
  • The time expense analysis in each part of the path.
  • The pathfinding algorithm for the shortest free path.
  • The program and construction optimization.
  • Setting up the program to reach the maximum performance speed and stability.